Our projects
1. Jhansi-Khujurao PKG-II Km- 90+800/ Km- 155+678 NH 75-76 on Automatic Vehicle Count & Classified (ATCC) survey using Tracon Software & Axle load Survey 2 Roads jhansi-khujurao District in uttar pradesh July 2018.
2. Samakhiali – Radahanpur Km- 341+200 NH-27 on Automatic Vehicle Count & Classified (ATCC) survey using Tracon Software & Axle load Survey 2 locations jhansi khujurao District in gujrat July 2018.
3. Santalpur- Radahanpur Km-480+000 NH-27 on Automatic Vehicle Count & Classified (ATCC) survey using Tracon Software & Axle load Survey 2 locations jhansi-khujurao District in gujrat July 2018.
4. Aligarh-Kalayanpur Km-220+600 NH-91 on Automatic Vehicle Count & Classified (ATCC) survey using Tracon Software & Axle load Survey 4 locations District in uttar pradesh august 2018.
5. NH-53 passing through Jalgaon city to 4 lanes along with construction of VUPS & PUP in the state of Maharasthra Km-3+800/Km-7+200 project road-from Kalika mandir – Ashoka hotel in Traffic survey on June 2019.
6. Project- Balance work of four-laning of Rai ganj-Dalkhola section of NH-34 from Km 398.00 to Km-452.750 (PKG-V) under NHDP phase-III in the state of West Bengal-under NHDP phase-III on EPC mode on Dec 2018.Write your text here...
7. Road name-NMSCE PKG-IV section-SH-207 Construction of access controlled Nagpur-Mumbai super communication expressway (Maharasthra samruddhi maha marg ) in the state of Maharasthra on EPC mode for PKG-IV ,from Km-162+667 to Km-217+023 (section-village Donad BK. to village Januna KH.) in district Washim on June 2019.
8. Award of the work for the services of “Traffic survey” of Muzaffarnagar-Saharanpur SH-59 Road on Aug 2019.
9. Deoband-Barla in MDR road “Traffic survey”on Aug 2019.
10. Construction of flyovers is Akola city in the state of Maharasthra on EPC mode location flyover Ch.1+900 railway station Akola-Ashok vatika May 2019.
11. NHAI-PIU-AMT-Constructions of flyovers at Karanja (GH.) town from Km-73.280 to Km-74.180 section of NH-53 in the state of Maharasthra on EPC mode on Aug 2019.
12. NH-53 passing through Jalgaon city to 4 lanes along with construction of VUPS & PUP in the state of Maharasthra Km-3+800/Km-7+200 project road-from Kalika mandir – Ashoka hotel in Traffic survey on June 2019.
13. Construction of flyovers is Mahaveer chowk in the state of Haryana Mahaveer chowk MG road, Mahaveer chowk-Gurugram bus stand road in Gurugram city on Sept 2019.
14. Delhi metro survey for Multi model intrigation under DMRC in Delhi city on Oct 2019. Metro station locations: - , Dwarka mor , Nawada , Uttam nagar west , Uttam nagar east , Janakpuri east , Sadipur , Rajender palace , Jhandewalan, Akshar dham , Mayur vihar Extn. , Laxmi nagar , Preet vihar , Karkarduma , Peera garhi , Nangloi
15. The project road – “Up gradation of Dabhota -Majra road Km-0/00 to Km-10/700 under PMGSY PKG no.-HP-II-104 in the state of Himachal Pradesh” on Nov 2019 the traffic survey in which following activities come under-
Andora-kotla road Km-0/00 to Km-5/00 under PMGSY PKG no.-HP-II 106.
Banalgi chandi phatt ki hatti road Km-0/00 to Km-12/300 under PMGSY PKG no.-HP-II-110.
Redu jhiri wala bhanglan road Km-0/00 to Km-7/300 under PMGSY PKG no.-HP-II-105.
Kheri – Meerpur gurudwara road Km-0/00 to Km-2/300 under PMGSY PKG no.-HP-II-267.
Oachghat – Kalaghat landal road under PMGSY PKG no.-HP-II-113.
Waknaghat – Subatu road under PMGSY PKG no.-HP-II-108.
Kanda Ladvi kunihar road km 9/000 to km 24/270 under PMGSY
PKG no. HP- ll-101.
16. Automatic Vehicle Count & Classified (ATCC) survey using Tracon Software & Axle load Survey for under PMGSY 2020-21 for 12 Nos. PMGSY-III in the state of Haryana June 30, 2021.
17. Automatic Vehicle Count & Classified (ATCC) survey using Tracon Software & Axle load Survey 2 Roads Fatehabad District in Haryana June 30, 2021.
18. Automatic Vehicle Count & Classified (ATCC) survey using Tracon Software & Axle load Survey at NH-148B from Surewala Chowk to Tohana in the state of Haryana Sept 09, 2021.
19. Videography classified volume count Survey (ATCC) (by Tracon Software 3 Locations) (24 Hrs. x 3 Days) Hisar Elevated Corridor in the state of Haryana Mar 30, 2022.
20. Videography Turning Moment Volume Count(ATCC) Survey (by Tracon software2 Locations) (24 Hrs.x 1Day) Hisar Elevated Corridor in the state of Haryana Mar 30, 2022.
21. Videography classified volume count (ATCC) Survey (by Tracon software 2 Locations) (24 Hrs. x 7 Days) SH-24 Rewari & Narnaul District in the state of Haryana Mar 30, 2022.
22. Axle load Survey (Double pad) ( both directions continuous) (24 Hrs. x 1 Day) SH-24 Rewari & Narnaul District in the state of Mar 30, 2022.
23. Videography classified volume count (ATCC) Survey (by Tracon Software 1 Location) (24 Hrs. x 7 Days) TP-18Narnaul-Nizampur Road at km 4.36 in the state of Mar 30, 2022.
24. Automatic Vehicle Count & Classified (ATCC) survey for 12 No. PMGSY III roads in District Sirmaur, Shimla & Kullu of Himachal Pradesh, India April 2022.
25. Automatic traffic counter & classifier (ATCC) Survey using Tracon Software for 7 days 24 Hrs. on Muzaffarnagar to Saharanpur (SH-59) road State of Utter Pradesh March 2021.
26. Automatic traffic counter & classifier (ATCC) Survey using Tracon Software for 7 days X 24 Hrs. Origin Destination(O-D) Survey for 24 Hrs. & Axle Load Survey 24 Hrs. (3 services for “4-Lane of Aligarh -Kanpur Section (NH-91)” state of Utter Pradesh on HAM Model under Bharatmala Pariyojna. March 2021.
27. Automatic traffic counter & classifier (ATCC) Survey using Tracon Software for 7 days X 24 Hrs. & Axle Load Survey for freight, cars, bus traffic (48 Hrs.) “4-Lane of Jagdishpur -Faizabad Section state of Utter Pradesh” under Bharatmala Pariyojna .
28. Automatic traffic counter & classifier (ATCC) Survey using Tracon Software for 7 days X 24 Hrs. & Axle Load Survey for freight, cars, bus traffic (48 Hrs.) On New 4-Lane Bridge (Parallel to the MG Setu) across river Ganga at Patna in the State of Bihar May 2022.
29. Automatic traffic counter & classifier (ATCC) Survey using Tracon Software for 7 days 24 Hrs. & Axle Load Survey for freight, cars, bus traffic (48 Hrs.) on 6-Lane Kanpur Lucknow Expressway in the state of Utter Pradesh under Bharatmala Pariyojna .
30. Traffic Volume Count (ATCC) Survey 7 days & Axle load Survey 24 Hrs. in the State of Himachal Pradesh Aug 2022. For the given locations August 2022.
31. Automatic traffic counter & classifier (ATCC) & Axle Load Survey on 6-Lane Animal Underpass at MH-CG border Section of NH-6(New NH-53) in the State of Maharastra August 2022.
32. Automatic traffic counter & classifier (ATCC) Survey at Bhagalpur in the state of Bihar August 2022.
33. Automatic traffic counter & classifier (ATCC) & Axle Load Survey at Ambdura in the state of Maharastra August 2022.
34. 7 days Automatic traffic counter & classifier (ATCC) survey for the project “Consultancy Services with Survey for the project "construction of bypass for providing interconnectivity amongst National Highways (NHs) around the Pratapgarh City (Pratapgarh Bypass) on EPC mode in the state of Uttar Pradesh." On May 2022.
35. Traffic Census on Hasanpur Chowk to Pahasu, Ghateda, Mundikhedi, Badgaon Roads in the state of Bihar. The traffic survey by videography and analysis of traffic volume count.
36. ATCC and Axle Load Survey for Rural Roads under PMGSY-III for the year 2020-21, for 38 Nos. PMGSY III roads in various districts (40 locations) of Assam, India. In June 2022.
MRL20-Maiegarh IV to Kabaitary Road.
MRL10-Sundari to Bidyapur road to Basugaon Kashikotra road via Goibari.
T05 KM-341 of NH-15 at Hatilung to Rongajan Road.
MRL05-NH31c to Ranchaidham road to Dangtol to Basugaon Road.
MRL18-NH31C Dologaon Tilapara to Basugaon Kashikotra Road via Tan Mozabari.
MRL04-Road from bhaktobari to Kahikuchi via Lower Mirzapur.
MRL01-Kuarpar Bazar to Chencoorie via Nunabani and Chendura Aigin.
T09-Oxiguri to Saraibil Bazar.
MRL01-Gomobil to Bhowraguri via Angthihara.
T11-Chandrapara to Ramphalbil Road.
MRL09-Kamalpur to Azara via Dalma and Haberikura.
T07-Bozaloni TE Road.
T05-Gandhia Balijan Tipuk Daisajan Road.
T05-Rongsai to Borjhora Road (NEC).
MRL10-NH-15 to Kowaripukhari via Bhut Pukhari.
T03-Subansah to Halogaon via Dhareswari Mandir.
T05-Mahchara Hollongpara NC Road.
MRL09-Bhabanipur Salbari Road to Bunmajar pam Road.
MRL03- Mandia Palhaji Road to Salimpur via Bamundongra Road.
MRL09-Kalairdai NC to Baghmara Char via Majorchar.
Mrl01-Nh 37 Hatiali to Bindhakata via Bagoritolia.
T05-Dimaruguri Kamarpur Road.
MRL07-No 1 Khataswar to Khajuabil via Sialmarikhuti
MRL14-Bechirnari to Daipangpara.
T04-Dhengururi to Silbori Road.
MRL08-NH 15 to Dalakati Jungle.
MRL01-Itakhola to Kusurntula Dipatula Road.
T04-Lanka Lurnding Road (SH-54) to Pub Odali North Road.
T01-Bagha Serkhan PWD road to Dhalai Bhubander PWD road.
MRL02 Road from Narayanpur Silikhaguri to Dhalpur Via kamalpur and Dakua
MRL06 Sonakhera-Bhubrighat Road.
MRL04-Matijuri to Chepti Brojapur Road.
T06 Road from Hshanghajo to Boro wapu.
MRL01 -From Tikalpar ONGC point to Bandoo TE via Kumbha And Endogram.
MRL 13 Banglagarh Jaberikuchi Road
NH15 to Chenialpara via Jogipara
NH15 to Dalakati Jungle
NH15 to Duliapara Grant Via Kowarapara
Tangni to Kaligaon Road
38.Automatic Traffic Vehicle Count & Classified (ATCC) Survey & Axle Load Survey under PMGSY-III at various district in the state of Haryana. On the following 12 locations in Feb 2021.
ODR-02 T-06 Farmana to Bainsi (Total Length - 5.74 Km)
T-08 Ishaq to Tangoli up to Punjab Border Jakhwala via Bakhli Mohanpur kalsa teokar Jakhwala (Total Length - 18.715 Km)
T-07 NH-71 to Akalgarh via Budha Khera Lather (Total Length -5.00 Km)
T14 Karnal Ladwa road to Kalri Jagir via Jainpur Taprian (Total Length - 13.02 Km)
Karnal Kachhwa Sambli Kaul Road (SH09) to Sitamai to Bukhapuri via Mohri Jagir Bhola Khalsa Golpura Sawant (Total Length -11.230 Km)
T-08 Ishaq to Tangoli up to Punjab Border Jakhwala via bakhli Mohanpur kalsa teokar Jakhwala (Total Length - 18.715 Km)
T-05 Dukehri to Bahnpur via Mohra - Durana - Barola - Jansui - Niharsi - Rasulpur - Nakatpur (Total Length - 35.00 Km)
T-15 Nigdu to Munak upto Block boundary via chakada (Total Length - 23.760)
T-08 Purkhas to Kailana via Dabarpur Sitawali (Total Length – 8.060)
TR-03 Sambhli to Amupura via Brass (Total Length – 7.880)
T-06 Kalwa to Hatt via Kalawati-Butani (Total Length – 8.320)
ODR-08 T-02 Rohtak Beri Road to Sangahera via Garnauthi Kakrana Sudana Kahanaur (Total Length-17.900).
39.Automatic Volume Count (ATCC) Survey by Tracon software (1 day X 24 Hrs.) at Hyderabad in the State of Telangana.
40. Axle Load Survey 2day (48 Hrs.) using double Pad at Galiya TP in the State of Assam.
41. Origin-Destination (O-D) Survey & Goods and Passengers Vehicle count Survey 2 days(48Hrs.) at Galita TP in the State of Assam.
42. Axle Load Survey Using double pad for 2days (48 Hrs.) at Hyderabad in the state of Telangana.
43. Automatic Vehicle Count & Classified (ATCC) Survey by Tracon software (3 day X 24 Hrs.) at Mumbai in the State of Maharastra.
44. Axle Load Survey Using double pad for 2days (48 Hrs.) at following Locations.
Orai in the state of Utter Pradesh.
Kharagpur in the state of West Bangal.
Samakhiali in the state of Gujrat.
45. Falling Weight Deflectometer (FWD) Survey at Kanpur in the state of Utter Pradesh.
46. Axle Load Survey (12Hrs.), Classified volume count (CVC) survey (3 day) on NH 354 section Arifke-Ferozpur Muktsar-Malout in the state of Punjab. (Km 201.500 to Km 212.500 & Km 229.690 to Km 269.960 of NH 354) on EPC mode. FWD & Report Making (24 km)
47. Automatic Vehicle Count & Classified (ATCC) Survey by Tracon software (3 Days) & Axle Load Survey (24 Hrs.) done in the state of Utter Pradesh at following Locations.
4 lane section (KM 0.000-KM 54.000) on SH-37 from Bareily to Nanital.
6 lane section (KM 438.687-KM 628.753) on NH-02 from Chakeri to Allahabad.
4 lane section (KM 47.930-KM 107.680) on NH-330A from Meerut to Nazibabad.
48.Axle Load Survey (48 Hrs.) done Jabalpur Ring Road (KM 19.050 to KM 39.175) near NH-45 (Length KM-20.125) under Bharatmala Pariyojna in the state of Madheya Pradesh.
49. Axle load survey & Origin Destination (O-D) survey for 48Hrs. at Mohali toll Plaza Nagpur in the State of Maharastra.
50. Automatic Vehicle Count & Classified (ATCC) Survey by Tracon software for 3 days in the state of Himachal Pradesh Under PMGSY-III (Batch-III) at following 12 locations.
Andhna to Rohal Road (Total Length – 9.00KM).
Badyara to Nandla Road (Total Length – 6.850 KM)
Badyara Kaloti Dumadhar (Total Length-5.80 KM).
T03 Damehli to Nishani to Arsu Road (Total Length-8.55 KM).
Link Road to Thanadhar (Total Length- 6.88 KM).
Rehari Gussan Donga Fag Road (Total Length-6.46 KM)
T01 Wazirbowali to Thachwa Road.
Shallana Johari Parvi Khad Road (Total Length-10.429 KM).
Sandhasu to Khasadhar Road (Total Length-10.05 Km).
Paller to Pidiyadhar (Total Length-6.595 KM)
T-02 Nither to Damah Road (Total Length-7.00 KM).
T-01 Sangrah to Paller Road (Total Length-12.27 KM).
51. Automatic Vehicle Count & Classified (ATCC) Survey by Tracon software for 7 days, Turning Movement Count (TMC) Survey for 24 Hrs. Passenger Pedestrian count survey for 24 Hrs. & Passenger Interview Survey at Andheri East & West Railway Station Mumbai in the state of Maharastra In Oct 2022.
52. Automatic Vehicle Count & Classified (ATCC) Survey by Tracon software for 7 days at Ambala Road Shadra Nagar Saharanpur in the state of Utter Pradesh in Nov 2022.
53. Automatic Vehicle Count & Classified (ATCC) Survey by Tracon software for 7 days at Lakhanaur Saharanpur in the state of Utter Pradesh in Apr 2022.
54. Automatic Vehicle Count & Classified (ATCC) Survey by Tracon software for 7 days at Balgaum-Kolhapur In the state of Maharastra in April 2022.
55. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7 days & Axle Load Survey 48 Hrs. at Koganoli in the State of Karnataka in May 2022.
56. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7 days & Axle Load Survey 24 Hrs. at Shirdi in the state of Maharastra in Nov 2022.
57. Traffic Survey for Axle Load Survey 48 Hrs. at NH-27 Amrapar Kutch Near Toll Plaza in the state of Gujrat in Oct 2022.
58. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7 days & Axle Load Survey 24 Hrs. at NH-33 Section (Bhagalpur to Vikramshila) in the state of Bihar May2022.
59. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 3 days at Gulalpurwa Toll Plaza Bahraich in the state of Utter Pradesh in May 2022.
60. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 3 Days Alhiyapur Aini Toll Plaza Bahraich in the State of Utter Pradesh in May 2022.
61. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7 days & Axle Load Survey 48 Hrs. in the State of Maharastra for the following location. •section of 4 lane NH-166 (From Mirya to Hathkhamba & from Pali to Ambaghat) (Total-55.909 Km)Section of 4 lane NH-166 (From Mirya to Hathkhamba & from Pali to Ambaghat) (Total-55.909 Km) in Nov 2022.
62. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7 days & Axle Load Survey 48 Hrs. in the State of Utter Pradesh for the following location. •section of 4 lane With Paved Solder From Km175.080 to 229.070 End of Hardoi Bypass to End of Hardoi Dist. of NH-731 in Sep 2022.
63. Axle Load Survey 24 Hrs. using double Pad In Both direction (UP & Down) For 2 Days X 24 Hrs. and Origin Destination (O-D) Survey (Passenger Vehicle Only) for 24 Hrs. Kalhapur in the State of Odisha .
64. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 3 days, Axle Load Survey 24 Hrs. at Various Dist. (At following locations) in the state of Punjab Under PMGSY-III completed in total 3 phases.
Phase-I Oct 2021
Begowal to Kartarpur via Bholath Km. 7.41 to Km. 16.31 (L=8.90kms)under PMGSY-III(Batch-III)
Bholath Maqsoodpur to kookan via Raipurpeer Buxwala Km. 0.00 to Km. 7.98 under PMGSY-III(Batch-III)
Bholath Kartarpur road Pandori to Ramgarh km. 0.00 to km. 8.47 under PMGSY III(Batch-III)
Nadala Bholath road to Nadala Subhanpur road via Model town, Bammuwal km. 0.00 to km. 8.50 under PMGSY-III(Batch-III)
Bholath to Lamme via Nadali, Bassi, Jaid, Km.0.00 to km. 15.34 under PMGSY III(Batch-III)
Tandi Aulakh to Boparai upto Kartar Bhogpur road km. 0.00 to km. 6.75under PMGSY-III(Batch-III)
Sarhind to Morinda Road under PMGSY-III(Batch-III)
NH-44 Kudda to Tahli Chowk via Khun Khun Kalan
Tanda Sri Hargobindpur Road to SH 22 to Awan Ghoreshawan
Phase - I Nov 2021
Sahora Kandi to Garhdiwala Raghwal Road upto Pandori Atwal along Kandi canal
NH 44(Mukerian) to Mukerian Naushera Gurdaspur Road(MDR-68) at Naushera Pattan via Ghallian
NH 44 Mukerian via Hayatpur,Sibbo Chack,Hardokhundpur,ferozepur Ghasitpur
Jalandhar Nakodar Road NH703 kang Sabbu to Kangniwal
Uggi to Kangsabu to Shahpur
Talwara Mubarikpur Road to Hajipur Dholbaha road via BringliBering Beh Khushala.
Mukrin Talwara Road Manser Hazipur road via Dhade Bhavail
NH 44 Tanda to Dholwaha Road
Samrai to Buldala ,km 0.00to km under PMGSY-III ( Batch-III ), Block Rurka
Mehtapur Parjian road to Shahkot via Mandiala Pandori Bhullar
Shahkot Malsian road to Parjian Kalan via Gobind Nagar,Dhandowal,Kanian Khurd
Lohian Punia road to Lohian Makhu road via Mehrajwala Mandi, Nall ,Manak
Rupewal to Talwandi Madho via Raiwal Dona
Phase – II April 2022
Rahon-jadla Road to Satluj Bandh via Usmanpur Jalwaha Chakli Jalwaha
Rahon-Machhiwara Road to Satluj Bandh via Ratnan Bairsal
Rohan- Aur Road to Mattewara Road via Wazidpur Malpur
Aur-Nssr Road to Rahon Mattewara Road via Dudhala, malpura, Mehrampur
Aur-Phillaur Road Phagwara Ropar Road via Chakdana, Bakhlaur, Mukandpur
Batala to Kahnuwan Road
Batala to Fatehgarh Road
Beas - Ghoman, Section Kartarpur Ghoman
Tarn Taran to Dialpur Road near Dam Dama Gurdwara
Tarn Taran Manochanal Chanabazpur Dialpur Road
Km- 0+000 Chheharta Dhandbir Baba Budha Sahib Road
Chheharta Dhandbir Baba Budha Sahib Road
TP-1 Neelon-Ropar Canal Road
TP-2 Neelon-Ropar Canal Road
Phase – III Jan 2023
TR-08 Malout to Blouch Khera (Bhatinda)
Lambi - Banwala Middu Khera Wring Khera upto Haryana Bounddary (Bhatinda)
Barnala Raikot Road to Sehjra via Kalala to Raisar to Bhotan (Barnala)
Chappa Kutba via Hardaspura (Barnala)
Mamdot to Jhoke Tehal Singh Road (Ferozepur)
NH 44 to Madhopur to Shahpur Kandi (Pathankot)
Sujjanpur to Shahpur Kandi (Pathankot)
Sarna Faridanagar upto Bhimpur (Pathankot)
Ajnala Jugdev Khurd Road to Poonga Jafarkot Road via Gurd Gumcha (Amritsar)
Ajnala Chagawan Road to Poonga road Govt. College Ajnala Naagal Wanhawala, Talwandi Dadurai (Amritsar)
Poonga to Sarangdev via Raipur Kalan (Amritsar)
Ajnala F.G.C Road to Focal Point Chamiari via Ibrahimpura Harrar Kalan (Amritsar)
Ajnala Chagawan Road to Ajnala Poonga Rd via Chak Phulla, Nangal, Wanjhwala, Kamirpur, Chak Alu (Amritsar)
ODR-04 Nihal Singh Wala Bhghapurna Road to ODR-06 Dhurkot Ranshih via Dhurkot Ranshih,Ranshih Kalan,Ranshih Khurd (Moga)
BGH-NSW Road to Gholia Kalan to Gholia Khurd (Moga)
Baghapurana Mudki Road ODR-06 RD 6.30 (TR-13)Bhaloor via Nathu wala Nathe wala (Moga)
ODR-08 Madheke Gurudawara Paka Sahib T-05 RD 29.20 km (Block Sehna ) via Saidoke (Moga)
T-01 to T-02 via Saidpur Kalke Butari (Amritsar)
Fatehpur rajputtan SH-22 to ASR Byepass via Kila Jiwan Singh Mehoka (Amritsar)
Kathunangal Tahil Sahib Road to Bhoewal (Amritsar)
Rayya to Rayya Nath Di Khui (Amritsar)
Mattewal to Bhilowaol via Khiddowali Pannwan (Amritsar)
Amritsar Mehta Road to T-04 to Sidhwan (Amritsar)
Tapiala to Sheron Bagya (Amritsar)
Kahunwan To Bhurian Sainian Via Simbli Upto Bhurian Gujra (Kahunwan)
Shri Hargobinbpur Road , Nainnekot , Ladhupur, Kiri Afgana Upto Kahnuwan Ghorewah Road (Kahnuwan)
Kahnuwan ,Chakyakoob Jagowal Bhattian Road Upto Ghorewah (Kahunwan)
Batala Shri Hargobindpur Road To Mathola Via Chemma Khudi Warsal Chack Metla (Shri Hargobindpur)
Amritsar-Shri Hargobindpur Road To Village Kapura (Shri Hargobindpur)
Mari Panwan Khokarwal Dogar Mahesh (Shri Hargobindpur)
Batala Shri Hargobindpur Road To Sandwan Via Attepur (Shri Hargobindpur)
Qadian Harchowal (Kahunwan)
Pandori To Btl Shgpur Road Via Ladha Munda Kohali (Shri Hargobindpur)
Gurdaspur Mukkerian Road To Dhanoya Pattan ,Mochpur,Fatubarkat ,Rajubela Chichra To Dhussi Band (Kahunwan)
Bhaini Mian Khan ,Mullanwal (Kahunwan)
Tugalwal Chack Sharif Road To Balwanda ,Raju Bela-Chichra To Dhussi Band (Kahunwan)
Bbm Road To Rampur Pitho Chowke (Bathinda)
Ballianwali To Lehra Mohbat (Bathinda)
Patti To Harike Khalra Road Via Kulla ,Manihala Jia Singh Wala (Patti)
Rattoke To Assal Uttar (Valtoha)
Batla Shri Hargobindpur Road To Mari Buchian Via Peizo Chack (Shri Hargobindpur)
Mehta Shri Hargobindpur Road To Bolewal Via Talwandi (Shri Hargobindpur)
Amritsar-Shri Hargobindpur Road To Dakoha Via Veela Bajju (Shri Hargobindpur) Kuttiwal Khurd To Bsbk Road Via Ghuman Kalan Sukha Singh Vala (Bathinda)
Mour Kotli Khurd Road To Sandona (Bathinda)
Mourchart Singh To Mour Talwandi Road Via Mansa Burj Manla (Bathinda)
Gobindpura To Bathinda Talwandi Road Via Bhucho Kalan (Bathinda)
Nhucho Kalan To Nathana Via Sema Poohli (Bathinda)
Selbrah To Bhairupa Upto Mlc (Bathinda)
Savia To Nahian Wala (Bathinda)
Bathindakheo Wali Road To Nh-64 (Bathinda)
65.Automatic Volume Count (ATCC) Survey by Tracon software for 3 days & Axle Load Survey for 24 Hrs. at the following locations at Parwaha, Chatapur, Ganpatgunj, Pupri in the state of Bihar. June 2023
Forebesgunj to Mirdanl Chawk at Parwaha.
Parwaha Chatapur to Partapgunj at Chatapur.
Simpahi Ganpatgunj to Partapgunj at Ganpatgunj
Pupri to Banibalti at Pupri.
4-8 lane of Chandikhole-Paradip Section of NH-53 (Old NH-5A) in May 2023.
68. Automatic Volume Count & Classified (ATCC) Survey by Videography & Tube based for 7 days, at Various Dist. (At following locations) in the state of Maharastra in July 2023.
NH44, Ralegaon, Yavatmal, Maharashtra, India
Primary Health Centre, Mardi, SH236, Dongargaon, Mardi, Maregaon, Yavatmal, Maharashtra, 445303, India
NH930, Chikhalgaon, Maregaon, Mangarul, Maregaon, Yavatmal, Maharashtra, 445304, India
SH233, Majra, Nimani, Zari-Jamani, Yavatmal, Maharashtra, India
SH234, Ruikot, Manglinewwasti, Zari-Jamani, Yavatmal, Maharashtra, 445322, India
SH234, Arli Khurd, Kelapur, Yavatmal, Maharashtra, India
NH353B, Lalguda, Dhamangaon, Korpana, Chandrapur, Maharashtra, India
SH6, Punwat, Wani, Yavatmal, Maharashtra, 442505, India
NH930, Manadwari, Chandrapur, Maharashtra, India
MSH9, Sindewahi, Chandrapur, Maharashtra, 441222, India
NH930, Chimadha, Mul, Chandrapur, Maharashtra, India
NH353B, Gondpipri, Chandrapur, Maharashtra, 442702, India
NH353C, Kakargatta, Lagam, Mulchera, Gadchiroli, Maharashtra, India
NH353C, Repanpalli, Aheri, Gadchiroli, Maharashtra, 442709, India
NH353C, Sironcha, Gadchiroli, Maharashtra, India
NH63, Sironcha, Gadchiroli, Maharashtra, India
NH130D, Permilli, Aheri, Gadchiroli, Maharashtra, India
NH130D, Medpalli, Bhamragad, Gadchiroli, Maharashtra, 442710, India
NH353C, Kishtapurtola, Yenapur, Chamorshi, Gadchiroli, Maharashtra, 442603, India
NH353C, Nawegaon, Chamorshi, Gadchiroli, Maharashtra, India
NH930, Petedongari, Gadchiroli, Maharashtra, 442605, India
NH930, Dhoni, Mowar, Dhanora, Gadchiroli, Maharashtra, 442606, India
NH353C, Sakhara, Gadchiroli, Maharashtra, 441208, India
NH353D, Kinhi, Brahmapuri Taluka, Chandrapur, Maharashtra, 441206, India
NH353C, Armori, Gadchiroli, Maharashtra, 441207, India
NH543, Ambetola, Purada, Kurkheda, Gadchiroli, Maharashtra, 441209, India
NH543, Piparkhari, Wasani, Deori Taluka, Gondiya, Maharashtra, India
NH353C, Chapral, Lakhandur Town, Lakhandur Taluka, Bhandara, Maharashtra, 441803, India
NH353C;SH277, Salebardi, Yetgaon, Sakoli Taluka, Bhandara, Maharashtra, 441805, India
NH53, Devjitola, Bhalitola, Sadak-Arjuni Taluka, Gondiya, Maharashtra, India
NH753, Goregaon, Goregaon Taluka, Gondiya, Maharashtra, 441800, India
Gondia - Tirora Road, Kudwa, Gondiya Taluka, Gondiya, Maharashtra, 441603, India
Bharat Petroleum, NH543, Rawanwadi, Gondiya Taluka, Gondiya, Maharashtra, 481220, India
NH543, Gortha, Amgaon Taluka, Gondiya, Maharashtra, 441902, India
NH543, Pangaon, Amgaon Taluka, Gon
69. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 3 days, Axle Load Survey 24 Hrs. by double pad & Subgrade Soil Investigation Test of 7 Km. in section Amreli to Liliyan in the state of Gujrat in August 2023.
70. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 3 days & Analysis report in Jalandhar Pathankot road to Adampur Bhogpur road via Beas Pind, Kotli Sheikha, Duhre, Mansurpur (Total Length 12.270 Km.) in the state of Punjab in August 2023.
71. Automatic volume count & Classified (ATCC) Survey by Tracon software for 3 days 1 location SH- 25 Chavand in the state of Gujarat August 2023.
72. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7 days & Axle Load Survey 48 Hrs. in the State of Maharastra for the following location. section of 4 lane NH-166 (From Mirya to Hathkhamba & from Pali to Ambaghat) (Total-55.909 Km)Section of 4 lane NH-166 (From Mirya to Hathkhamba & from Pali to Ambaghat) (Total-55.909 Km) in Aug 2023.
73. Traffic Survey for Axle Load Survey & Origin-Destination survey 48 Hrs.(Both directions) Double pad at Brij Bhoomi Expressway NH-509 Madrak Toll Plaza in the state of uttar pradesh in Aug 2023.
74. Traffic Survey for Axle Load Survey 48 Hrs.(Both directions) Double pad at Brij Bhoomi Expressway NH-509 Baros Toll Plaza in the state of uttar pradesh in Aug 2023
75. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 3 days & Axle Load Survey 24 Hrs. gurdashpur to mukerian in the state of Punjab.Sep 2023.
76. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7 days & Axle Load Survey 48 Hrs. in the State of Jarkhand for the following location.
Construction of 6-Lane green field Varanasi-Ranchi – Kolkata highway from sonepurbigha village to junction with NH-22 (chatra bypass) near chatra from km.222+000 under bharatmala pariyojana in the state of Jharkhand on hybrid annuity mode PKG-8 location – NH19 toll plaza-SAUKALA chainage- 200+100 Aurangabad – Barachatti (km 180.00 to km 240.000) SEP 2023.
77. Four laining of NH-166 from mirya at km 0.00 (EX. Km 0+000) to hathkhamba at km.19.769 (EXch. 19+800) & from pali at km.31.000 (EX ch 31+000) to ambaghat atkm.67.140 (EX.km 69+072) (design length =55.909 km) in the state of maharastra to be executed under NH (0) on hybrid annuity mode Automatic volume count & classified ( ATCC) survey by tracon software for 7 days location in the state of maharastra project. 20, sep 2023.
78. Project: - Barwa adda expressway limited (BAEL) was engaged for the construction of a six-lane highway in the barwa-adda section of NH-02 from km. 398.240 to km. 521.120 (design lenth of approximately 122.88 km/727 lane km) in the state of Jharkhand and west Bengal under national highway development program phase v on a design-build-finance operate-transfer basis. : Award of work for the services of “AXLE LOAD survey and SUBGRADE SAMPLING “ in the state of Jharkhand WB nov 2023.
79. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7 days 2 locations & origin – destination Survey 24 Hrs.2 locations & rajestration plate survey 24hrs. 2 locations Rampura toll plaza – Laxmannath toll plaza NH 16 kharagpur to balasore in the state of orissa. WB nov 2023.
80. Traffic Survey for Axle Load Survey 48 Hrs.(Both directions) Double pad at NH- 16 gudipada Toll Plaza in the state of orissa in nov 2023.
81. ”Widening and Strengthening of boragaon kale to murud akola (section-I) from km 61/800 to 72/900 (length -11.10 km) section of NH-63 to 2-lane configuration and Latur airport junction to mahila polytechnic (section-II) from km 78/900 to 86/850 (length 7.95km) section of NH-63 to 4- lane configuration (total project length – 19.05 km) in the state of Maharashtra on EPC Mode .” Traffic Survey and Topography survey , subgrade soil sampiling test ATCC SURVEY 7 days 24 Hrs.(Both directions) AXLE LOAD SURVEY 48 hrs. (both directions) Double pad, ROAD INVENTIORY(Total lenght KM 19.05) at NH-63 latur in the state of Maharashtra in dec 2023-jan 2024
82. Project:- Design consultancy services for – widening and strengthening of NH-5A ( New- NH-53) masakani to Paradip stretch from existing km 60.000 to existing km.76+646(total design length 16.646 km) of chandikhole to Paradip section of NH-53 from existing four lane to eaight lane paved shoulder standard in the state of odisha on hybrid annuity Mode under NH(O) (PACKAGE – IV)
a. Carring out traffic volume count, videography based (ATCC by tracon software) 24hrs. and seven days in two locations
b. Axle load survey using the axle load pad for 24hrs. prescribed format only in two locations
c. Subgrade soil sample test (total length- 16.5 km 16 pits) in dec 2023- Jan 2024
83. Automatic Vehicle Count & Classified (ATCC) Survey by Tracon software for 3 days at Rattangarh Road in the state of pungab in dec 2023- jan 2024
84. Automatic Vehicle Count & Classified (ATCC) Survey by Tracon software for one day, 13 locations Turning Movement Count (TMC) Survey for 12 Hrs. in Goverment of Karnataka state highways improvement project (public works department) in the state of karnataka In Jan2024.
85. Construction of new 4-lane prayagraj southern bypass from design km.43.200 (near mahuari) to design km. 50.860 (near nababa urf nibi kala uparhar) (design length 7.660 km.) package -2 under phase-1 on NH-19 in the state of up under bharatmala on EPC mode – request for permission to conduct traffic survey for the project- reg. NH-35 &NH 135 C Chainage- 44+200 4 Lane Prayagraj southern greenfield bypass. Jan 2024
7 days traffic volume count survey
2 days axle load survey
*1 day origin and destination survey
86. Automatic Vehicle Count & Classified (ATCC) Survey by Tracon software for 7 days 3 locations jamujhadi km. 0+200 biras km. 24+000 kushanparshad km.54+000 and Axle load survey 24hrs. three locations km.0+200 km.24+000 km.48+000 at section Road jamujhadi-dhamara in the state of odisha in feb 2024.
87. Traffic Survey for Axle Load Survey 24 Hrs.(Both directions) Double pad at NH-27 Section (shivpuri-jhansi) Raksha Toll Plaza in the state of utter pardesh in feb 2024
88. Traffic Survey for Axle Load Survey 24 Hrs.(Both directions) Double pad at NH-02 section (agra bypass) Raibha Toll Plaza in the state of utter pardesh in feb 2024
89. Traffic Survey for Axle Load Survey 24 Hrs.(Both directions) Double pad at NH 27section (palanpur-aburoad-swaroopganj) Khemana Toll Plaza in the state of gujrat in feb 2024
90. Traffic Survey for Axle Load Survey 24 Hrs.(Both directions) Double pad at NH-27 section (palanpur-aburoad-swaroopganj) udyariya Toll Plaza in the state of gujrat in feb 2024
91. Automatic Vehicle Count & Classified (ATCC) Survey by Tracon software for 3 days 5 locations at mundra port in the state of gujrat in feb – 2024
92. Subgrade soil sample test (total length- 7 pits) in feb- 2024
A. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 24 x 1day & Axle Load Survey 24 Hrs. in the State of kerala for the following location.
B. 6- laining of ramanattukara to valanchery on NH-66 on HAM. length kms-39.68 KM.CH.263+000 KM.CH.284+400
C. 6- laining of valanchery to kappirikkad on NH-66 ON HAM. length kms-37.35 KM. CH.311+800 KM.CH.315+500
D. 6- laining of kappirikkad to thalikulam on NH-66 on HAM. Length kms-33.165 KM.CH. 335+800 KM.CH. 369+000
E. 6- laining of thalikulum to kodungallur on NH-66 on HAM. Length kms-28.835 KM.CH. 397+750
F. 6- laining of kodungallur to edappally on NH-66 on HAM.lenght kms-26.03 KM.CH. 412+800 KM.CH. 419+000
93. Automatic Vehicle Count & Classified (ATCC) Survey and by Tracon software for 7 days 1 location and AXLE LOAD SURVEY 24hrs. with traffic survey report at section-NH 119 in the state of uttar pradesh in march -2024.Development of section of 2 lane with paved shoulder of najibabad kotdwar section of NH-119 from design chainage 122+200 to km 137+760 (existing chainage 138.635) in the state of uttar Pradesh march 2024.
94. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days location, Axle Load Survey 24 Hrs. by double pad & ORIGIN- DESTINATION SURVEY 24hrs. & Subgrade Soil Investigation Test of 27 Kms. 26 pits and 30 pits in section kalyanpur-teliamura NH-208 km.ch. 114+900 in the state of tripura in march- 2024
95. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 3locations, Axle Load Survey 24 Hrs./48hrs. 3locatoins by double pad & ORIGIN- DESTINATION SURVEY 72hrs.3 locations & Subgrade Soil Investigation Test of 16 Kms. 16 pits and in section raniganj bypass and location name 1. Haripur NH-60 2.Raniganj NH-60 3.Raniganj NH-02 km. in the state of west bangal in march- April 2024.
96. Traffic survey AXLE LOAD SURVEY 24hrs. for 1 day 1 location jamujhadi km. 0+200 biras km. 24+000 kushanparshad km.54+000 km.0+200 km.24+000 km.48+000 at section Road jamujhadi-dhamara in the state of odisha in march- 2024.
97. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 3days 2locations, Axle Load Survey 24 Hrs. 2locatoins by double pad with traffic survey report TP- 01 ,TP-02 in section Ropar in the state of punjab in march- 2024. CHAMKAUR SAHIB NEELON DORAHA ROAD Regarding traffic survey by automatic traffic counter and classifier (ATCC) for ropar chamkaur sahib neelon doraha road length- 54.737Km
98. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 3locations, Axle Load Survey 48hrs. 2locatoins by double pad & ORIGIN- DESTINATION SURVEY 24hrs.2 locations & TRUNING MOVEMENT COUNT SURVEY 4 locations 4hs. morning and 4hrs.evening pick hours in section AMB TO UNA , MUBARIKPUR TO GAGRET NH-503A km. in the state of Himachal pradesh in April 2024.
99. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 3days 8locations, Axle Load Survey 24 Hrs. 5locatoins by double pad & Subgrade Soil Investigation Test of 16 Kms. 15 pits and in section bhuj in the state of gujrat in April 2024.
100. Traffic Survey for Axle Load Survey 24 Hrs.(Both directions) Double pad at NH mundra port in the state of gujrat in may 2024
101. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 1locations, 3days 1location , Axle Load Survey 24hrs. 1locatoins by double pad & TRUNING MOVEMENT COUNT SURVEY 1 locations 24hrs. in section bardhaman bolpur-orgra NH-2B in the state of west bangal in may 2024.
102. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 2locations, Axle Load Survey 24hrs. 2locatoins by double pad & traffic survey report etawha in project name:- widening & strengthening of section from bharthana chowk to kodaarkoot (km.0.00 to km.40.00) of NH-91A in the state of uttar Pradesh on EPC Mode section in April-may 2024.
103. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 1locations, Axle Load Survey 48hrs. 1locatoins by double pad PROJECT:- Construction of 4 -lane highway from km 49.155 to km 74.700 ( singraur uphar to baranpur kadipur ichauli) of NH- 731A with paved shoulders (i/c ganga bridge) in the state of uttar pradesh on Hybrid annuity Mode (Package – lll) may2024
104. Traffic Survey for Axle Load Survey 48 Hrs.(Both directions) Double pad at Section (vadodara road) in the state of gujrat in Jun 2024
105. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 2 locations, 3days 1 location,Axle Load Survey 24 Hrs. 2 locations by double pad & ORIGIN- DESTINATION SURVEY 24hrs. 3 locations in section REWA-RENUKOOT GARWA-DALTONGANJ-RANCHI NH-75E in the state of uttar pradesh in jun- 2024. PROJECT – Project management consultancy services (PMC) for preparation of detailed project report , pre-construction activity and project supervision of widening to 4L of REWA-RENUKOOT-GARWA-DALTONGANG-RANCHI of NH-75E (for up portion) in the state of uttar Pradesh.
1. Traffic survey,Axle Load Survey 24 Hrs. 4 locations by double pad & ORIGIN- DESTINATION SURVEY 24hrs. 4 locations in section in the state of Gujrat in april- 2024. 2. Section-Aambarbadi-rajula SH-30 amreli to rajula 3. Section-Nanamandeva – gondal 4. Section-hadala-sh-24 rajkot-hadala
106. Topography survey lumsum 20.07-acre Sonipat polytechnic college in the state of Haryana July 2024
107.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 1locations, Axle Load Survey 24 Hrs. 1locatoins by double pad tamabil border dwaki in the state of Meghalaya in Aug. 2024.
108.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 2 locations, Axle Load Survey 24 Hrs. 2 locations by double pad & ORIGIN- DESTINATION SURVEY 24hrs. 2 locations and subgrade sample test (soil) 10 points in section NH-117 KM-0.400 CVC+AXLE+OD-1/KM-6.800 CVC+AXLE+O-D-2 KOLKATA in the state of WEST BANGALin AUG- 2024
109.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 3days 4 locations, & ORIGIN- DESTINATION SURVEY 24hrs. 4 locations and SPEED & DEALY SURVEY 40KMS. REGESTRATION PLATE SURVEY 4 LOCATIONS NASHIK in the state of MAHARASTRA in AUG- 2024.
110.Traffic Survey for Axle Load Survey 24 Hrs.(Both directions) Double pad 7 days continauos at NH-16 near Vishakhapatnam in the state of Andhra pradesh in sep. 2024.
PROJECT DETAILS- Toll plaza locations near Vishakhapatnam at narsannapeta to ankapalli section of NH- 16 these toll plaza are at madapam@589+550,natavalasa@656+704,dukkayanjpalem@686+540 and marripalem@722+154.
Axle load surveys for 7 continuous days in both directions.2numbers of calibrated axle load pads for each location (1 for each direction) shall be used at each location. MINIMUM SAMPLE SIZE FOR AXLE LOAD IS TARGETED AT 50% AND SHELL BE NOT LESS THAN 40%
110.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for TRUNING MOVEMENT COUNT SURVEY 57 locations 24hrs. in section ULUNDURPET-PADALUR-23 LOCATIONS, PADALUR-TRICHY-7 LOCATIONS, TRICHY-MADURAI-22 LOCATIONS, TRICHY-KARUR -7 LOCATIONS in the state of TAMILNADUin OCT.2024.
111.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 3days 2locations, Axle Load Survey 24 Hrs. 3locatoins by double pad with traffic survey report TP- 01 ,TP-02 and km.26+210,km.40+300,km.46+500 in section Ropar in the state of punjab in oct- 2024.
112.CHAMKAUR SAHIB NEELON DORAHA ROAD Regarding traffic survey by automatic traffic counter and classifier (ATCC) for ropar chamkaur sahib neelon doraha road length- 54.737km oct 2024.
113.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 2locations, garhchirolli in the state of MAHARASHTRA in oct. 2024.
114EPC 69- “Improvement to Dahegoan Waigaon Kosurla Katri SH-322(A) Km 0/00 to 8/100 (Part- Deoli
to Dhegaon), SH-322 Km 16/640 to 30/500 (Part- Deoli to Waigaon), SH-267 Km 67/00 to 89/600 (Part- Waigaon to Katri) Total Length =44.60 Km) Taluka - Deoli District – Wardha” (Under EPC) Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 1 locations, Axle Load Survey 24 Hrs. 1locations by double pad & ORIGIN- DESTINATION SURVEY 24hrs. 1 locations and in section SH-322 wardha in the state of Maharashtra in oct- 2024.
115.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 3locations, FATHEGANJ,HARDOI LC GATE 371,374,247 TRAFFIC CENSUS OF LEVEL CROSSING GATES in the state of UTTER PRADESH in oct. 2024.
116.Traffic Survey for Axle Load Survey 24 Hrs.(Both directions) Double pad 24X1 day continauos 2 locations at RAIPUR-SIMGA & SARAGAON-BILASPUR ROAD SECTION in the state of CHHATTISGARH in oct. 2024.
117.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 3locations,1. NANGILIKONDAN- 60+459 2. KARIYAMANGALAM-139+255 3. NAGAMPATTI-196+650 in the state of TAMILNADU in NOV. 2024.
118.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 2locations,1. BELON TOLL PLAZA KM- 142+300 2. MOHAMMAD IBRAHIMPUR TOLL PLAZA KM-207+800 in the state of UTTAR PRADESH in NOV. 2024.
119.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 1locations, Axle Load Survey 24 Hrs. 1locatoins by double pad Bhuj in the state of Gujarat in Nov. 2024.
120Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 1locations, Axle Load Survey 24 Hrs. 1locatoins by double pad Nashik in the state of Maharashtra in Nov. 2024.
121.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 1locations, Axle Load Survey 24 Hrs. 1locatoins by double pad tamabil border dwaki in the state of Meghalaya in Nov. 2024.
122.Traffic Survey for Axle Load Survey 48 Hrs.(Both directions) Double pad at Section (Ahamadabad) in the state of gujarat in Dec. 2024
123.Automatic Turning Movement Count Survey & Classified (ATCC) Survey by Tracon software for 24hrs 1day 2locations, Passenger Preference (Road Side/Bus Terminal) Survey24 Hrs. 2locatoins Nashik Moradabad to Roza Section in the state of uttar pradesh in Nov. 2024.
124.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 1locations, Mahoba in the state of utterpradesh in Nov. 2024.
125.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 24 x 7 Days 1locations, Axle Load Survey 24 Hrs. 1locatoins by double pad with traffic survey report in section Mogha in the state of punjab in Nov- 2024.
Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 5 locations, Axle Load Survey 24 Hrs. 5 locations by double pad & ORIGIN- DESTINATION SURVEY 24hrs. 5 locations and Turning Movement Count Survey 24hrs.4 Locations in section Thongikro-Moulkang-Simtuilong-Semkhor-Maibang-Gunjang-Jorai-Longkuk km Length-112 & Baga-EmbruBra-Droho-Dimainu-Thanalambra Km Length-36.6( ADRHARDP) in the state of Assam in Dec- 2024.
126.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 24 x 7 Days 1locations, traffic survey report in section Ladpura-Bhilwara Khachrol Toll Plaza in the state of Rajestan in Jan- 2025.
127Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 3 locations, Axle Load Survey 48Hrs. 3 locations by double pad & ORIGIN- DESTINATION SURVEY 48hrs. 3 locations in section Madurai New Proposed Toll Plaza Locations km-116+450 of NH-83 Pudukudi, km-152+600 of NH-38 Pullur & km-238+800 NH-38 Jagaveerapandi apuram in the state of Tamilnadu in Jan- 2025.
128.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 4 locations, Axle Load Survey 48Hrs. 4 locations by double pad & ORIGIN- DESTINATION SURVEY 24hrs. 4 locations section- NH-183 CH- 38+855 and NH-183 CH- 63+600, NH-183 CH-98+600 and NH-183 CH- 128+000 Munnar in the state of kerala in feb- 2025.
129.Speed & delay survey 500 km. section munnar in the state of kerala feb -2025.
130.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 1days 24hrs. section-mandapaka-eturangaram in the state of Andhra pradesh in feb- 2025.
131.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 24 x 7 Days 1locations, traffic survey report in section Rajkot in the state of Gujarat in march- 2025.
132.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 24 x 1Day 2locations, traffic survey report in section NH-44 Panipat, Ludhiyana in the state of Punjab in march- 2025
133.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 3days 100locations, Axle Load Survey 24 Hrs. 100locatoins by double pad Varius Road in the state of Gujarat in April. 2025.


134. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 24 x 7 Days 1locations, traffic survey report in section Rajkot in the state of Gujarat in march- 2025.
135. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 24 x 1Day 2locations, traffic survey report in section NH-44 Panipat, Ludhiyana in the state of Punjab in march- 2025
136 Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 3days 100locations, Axle Load Survey 24 Hrs. 100locatoins by double pad Varius Road in the state of Gujarat in April. 2025.


















137. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for
138. days 3 locations, ORIGIN- DESTINATION SURVEY 24hrs . 3 locations Bus Stand Survay 24 Hours 2 Location section - Kota To Sheopur Kalan in the state of Rajasthan in May- 2025.
139.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 2 locations, Axle Load Survey 48Hrs. 2 locations by double pad & ORIGIN-
140.DESTINATION SURVEY 24hrs. 2 locations section- Raja TP & Other Darbanga in the state of Bihar in May- 2025.
141. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 3 locations, Mazafarpur in the state of Bihar in June- 2025
141. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 1 locations, Axle Load Survey 24Hrs. 1 locations by double pad. Kishan Ganj in the state of Bihar in June- 2025.
142. Axle Load Survey 24Hrs. 2 locations by double pad. Palanpur in the state of Gujrat in June- 2025
143. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 12 locations, Axle Load Survey 24Hrs. 4 locations by double pad & ORIGIN- DESTINATION SURVEY 24hrs. 4 locations section- Jhansi in the state of Uttar Pradesh in July- 2025.
144. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 1 locations, Axle Load Survey 24Hrs. 1 locations by double pad. in the state of Tripura in July- 2025.
145.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 3 locations, Axle Load Survey 48Hrs. 2 locations by double pad & ORIGIN- DESTINATION SURVEY 24hrs. 2 locations Turning Movement Count Survey 24hrs..Location section- Thane Mumbai in the state of Maharashtra in Aug- 2025.
147.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 24hrs. 1 locations, Axle Load Survey 7 Days. 24Hrs. 1 locations by double pad. For Laning of Salsalabari-Assam Boarder in the state of West Bengal in Aug- 2025.Turning Movement Count Survey 16hrs.12 Location section- Udaypur City in the state of Rajasthan in Aug- 2025.
148.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 2 locations, Nagpur Bypass in the state of Maharashtra in July- 2025.
150.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 24hrs. 2 locations, Axle Load Survey 7 Days. 24Hrs. 1 locations by double pad.Akola in the state of Maharashtra in Aug- 2025.
151. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 24hrs. 2 locations, Axle Load Survey 7 Days. 24Hrs. 1 locations by double pad.Gudapalli & Gurapalli in the state of Odisha in Aug- 2025.
152.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 3days 24hrs. 2 locations, Axle Load Survey 1 Days. 24Hrs. 2 locations by double pad.Fazilka in the state of Punjab in Aug- 2025.
153.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 2days 24hrs 30 locations, ORIGIN- DESTINATION SURVEY 2days 24hrs. 30 locations section- Lucknow in the state of Uttar Pradesh in Sep- 2025.
154. Axle Load Survey 24Hrs. 1 locations by double pad and DCP Survey 5 Points Ruderpur in the state of Uttarkhand in Sep- 2025.
155.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 3days 24hrs. 2 locations,Taran Tarran in the state of Punjab in Nov- 2025.
156.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 3days 24hrs. 2 locations, Axle Load Survey 1 Days. 24Hrs. 2 locations by double pad.Samana in the state of Punjab in Nov- 2025.
158. Automatic Volume Count & Classified (ATCC) Survey by Vats software for 3days 24hrs. 1 locations, Axle Load Survey 1 Days. 24Hrs. 1locations by double pad.Kopergaon in the state of Punjab in Dec- 2025.
159.Automatic Volume Count & Classified (ATCC) Survey by Vats software for 3days 24hrs. 11 locations,Palanpur in the state of Maharashtra in Dec- 2025.
160.Automatic Volume Count & Classified (ATCC) Survey by Vats software for 3days 24hrs. 2 locations,Dadiapada in the state of Gujrat in Dec- 2025.
161.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 24hrs. 1 locations, Axle Load Survey 1 Days. 24Hrs. 1 locations by double pad.Bhuj in the state of Gujrat in Dec- 2025.
162.Axle Load Survey 48Hrs. 6 locations by double pad. Section – Muzaffarpur-Darbanga-Darbanga-Purnia Project Details- Barsauni Toll Plaza, Asanpur Toll Plaza,Hariabara Toll Plaza,Maithi Toll Plaza, Panisala Toll Plaza, Raje Toll Plaza in the state of Bihar in Dec- 2025.
163.Axle Load Survey 24Hrs. 1 location by double pad & ORIGIN- DESTINATION SURVEY 24hrs. 1 location section- Chotiya Toll Plaza in the state of Chhattisgarh in Dec- 2025 ORIGIN- DESTINATION SURVEY 24hrs. 1 location section- Ambikapur in the state of Chhattisgarh in Dec- 2025 Axle Load Survey 24Hrs. 2locations by double pad section- Moradabad-barelly Toll Plaza in the state of Chhattisgarh in Jan- 2026
164.Master Plan Project Nahan City Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 2days 24hrs. 2 locations,Classified Volume Count (Manual Based) 6hrs.5Locations Origin-Destination Survey 12 hrs. 2 locations Speed and Dealy Survey Length-5km. and Public Transport Terminal Survey 5 Locations & Parking Survey 1 day 8 Locations and Road inventory Survey Length- 3km. Nahan in the state of Himachal Pradesh in Jan- 2026.
Master Plan Project Chamba City Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 2days 24hrs. 2 locations,Classified Volume Count (Manual Based) 6hrs.5Locations Origin-Destination Survey 12 hrs. 3 locations Speed and Dealy Survey Length-20km. and Public Transport Terminal Survey 5 Locations & Parking Survey 1 day 8 Locations and Road inventory Survey Length- 20km. chamba in the state of Himachal Pradesh in Jan- 2026.
165.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 24hrs. 2 locations, Axle Load Survey 2 Days. 48Hrs. 2 locations by double pad.Balgaon in the state of Karnataka in Jan- 2026. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 3days 24hrs. 1 location,Kaurli in the state of Punjab in Jan- 2026.
166.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 1 location, Axle Load Survey 24Hrs. 1 location by double pad & ORIGIN- DESTINATION SURVEY 24hrs. 1 location section- Buxor in the state of Bihar in Jan- 2026.NSV SURVEY 3D
Work of Project – “Rehabilitation and Upgradation of Thorrur to Nehru Nagar Section to Two-Lane with Paved Shoulders from Km. 109+420 to Km. 178+500 of NH-930P in the state of Telangana”. In Feb-2026.
167. Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 24hrs. 2 locations, Axle Load Survey 2 Days. 48Hrs. 2 locations by double pad. 1. Chainage-12+400 TP-1 Bhago Majra Rigid width(m)-86 No.of Lanes-8(bothSide)
168.Chainage-60+320 TP-2 Ghulal Rigid width(m)-86 No.of Lanes-8(bothSide)Project Section- “ Kharar-Ludhiana” in the state of Punjab in Feb- 2026
169.Axle Load Survey 24Hrs. 1location by double pad Project- Ahmedabad-Mehsana Section- (from- km.19+000 to km.70+600)Toll Plaza in the state of Gujarat in Feb- 2026.
170. Axle Load Survey 48Hrs. 2locations by double pad section- Four Laning of Krishnanagar-Bharampore Section- of NH-12 fromkm.115.00 to km.193.000 Toll Plaza locations in the state of West Bengal in feb- 2026.
171.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 3 locations, Axle Load Survey 24Hrs. 3locations by double pad & ORIGIN- DESTINATION SURVEY 24hrs. 1 location section-on existing NH- 34 fromkm.7.430 to km130.100 Kanpur-Kabrai in the state of Uttar Pradesh in Mar- 2026.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 3days 24hrs. 1 location, 2days 24hrs.1 location Axle Load Survey 1 Day. 24Hrs. 1locations by double pad. DND Noida Flyover in the state of Uttar pradesh in Mar- 2026.
172.Axle Load Survey 48Hrs. 2 locations by double pad. Section – Muzaffarpur-Darbanga-Darbanga-Purnia Project Details- Panisala Toll Plaza, Raje Toll Plaza in the state of Bihar in Mar- 2026.utomatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 3 locations, ORIGIN- DESTINATION SURVEY 24hrs. 1 location section- Nashik in the state of Maharashtra in Mar- 2026.
173.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 3days 2 locations (Modasa), 3days 3Locations (Bhuj) section- Modasha & Bhuj in the state of Gujratin Mar- 2026.
174.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 3 locations,section- BPCL 12.240 Domghar Moradabad in the state of Uttar Pradesh in Mar- 2026.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 3days 2 locations, Axle Load Survey 48Hrs. 2 location by double pad & NSV Survey , FWD Survey Length-km.113 Soil Investigation km.113- 32 Pits section- SH-05A Varanasi-Shakti Nagar Road in the state of Uttar Pradesh in Mar- 2026.
175.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 15 locations, Axle Load Survey 24Hrs. 16 locations by double pad & ORIGIN- DESTINATION SURVEY 24hrs. 19 locations & Turning Movment Count Survey 15 Locations 24hrs. section- Palakkad,Kannur,Calicut,Cochin 1, Cochin 2 in the state of Kerla in Mar- 2026.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 3days 24hrs. 2 locations,Landren in the state of Punjab in April- 2026.
176.Axle Load Survey 48Hrs. 1 locations by double pad. Section – at Vadodara- Halol Road project in the state of Gujarat in April- 2026.
177.Subject:- Work order for Work of Traffic Survey work for Consultancy Services of Authority’s Engineer for Supervision of Construction of Four Laning of Karwar (Km 281.980 of NH-62 Nagaur road) to Dangiyavas Section-Package-II (design length 30.093 Km) of Jodhpur Ring Road on EPC Mode in the State of Rajasthan.
178.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 25 Directions, section- Jodhpur in the state of Rajestan in April- 2026.
179.Axle Load Survey 24Hrs. 1locations by double pad. & TMC Survey 1 Location Section - Project Belepole Junction in the state of Bangal in April- 2026.
180.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 24hrs. 1 location & Axle Load Survey 2 Days. 48Hrs. 1locations by double pad. Khairatunda – Barwa Adda Road in the state of Jharkhand in May- 2026.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 24hrs. 1 location & Axle Load Survey 2 Days. 48Hrs. 1locations by double pad. At Ranasthalam – Anandapuram Road in the state of Andhra Pradesh in May- 2026.
181.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 3days 24hrs. 4 locations,Ropar in the state of Punjab in May- 2026.
182. Axle Load Survey 48Hrs. 2ocations by double pad. Section - Project – Moradabad-Barelly in the state of Uttar Pradesh in May- 2026.
183.Axle Load Survey 48Hrs. 3ocations by double pad. Section - Project – Barwa adda in the state of Jharkhand in May- 2026
184.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 3days 24hrs. 1 location & Axle Load Survey 1 Day. 24Hrs. 1locations by double pad. Chitrakoot Road in the state of Madheya Pradesh in May- 2026.
185.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 24hrs. 2 locations & Axle Load Survey 2Days. 48Hrs. 2locations by double pad. Belgavei Road in the state of Karnataka in Jun- 2026.
186.Axle Load Survey 24Hrs. 2ocations by double pad. Section - Project – Darbhanga-Purnia in the state of Bihar in Jun- 2026.
187.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 24hrs. 2locations,
188.Axle Load Survey 24Hrs. 2ocations by double pad. Section - Project – Darbhanga-Purnia in the state of Bihar in Jun- 2026.
189.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 24hrs. 2locations,Raichur in the state of Karnataka in Jun- 2026.
190.Axle Load Survey 24Hrs. 4ocations by double pad. Section - Project – in the state of Odisha in Jun-2026.
191.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 7days 24hrs. 2 locations & Axle Load Survey 2Days. 48Hrs. 2locations by double pad. Subanpur Road in the state of Punjab in July- 2026.
192.Automatic Volume Count & Classified (ATCC) Survey by Tracon software for 3days 24hrs. 4 locations & Axle Load Survey 1Day. 24Hrs. 2locations by double pad. Mundra-Bhuj Road in the state of Gujarat in July- 2026.
193.Axle Load Survey 24Hrs. 1 location by double pad & ORIGIN- DESTINATION SURVEY 24hrs. 1 location & 9 Points Test Pits section- Ramnagar in the state of West Bengal in July- 2026
194.Axle Load Survey 48Hrs. 3Locations by double pad. Section - Tumakar Road in the state of Karnataka in July-2026.
JAGLAN HIGHWAY ENGINEERING SURVEY
+91 8009790508 +91 9315511711
GSTIN NO : 07BDDPK4125M1ZI
Add : C-104 R K Puram, Madhuban Bapu Dham Road Govind Puram, Ghaziabad Uttar Pradesh, Pin-201013
Flat No-2 , B-49, Pandav NagarEast Delhi, Delhi 110092
CONTACT
project
